Environmental
- Chapter 1 Introduction
- Chapter 2 Background to the Proposed Development
- Chapter 3 Description of the Proposed Development
- Chapter 4 Consideration of Reasonable Alternatives
- Chapter 5 Policy Planning and Development Context
- Chapter 6 Population & Human Health
- Chapter 7 Biodiversity
- Chapter 8 Ornithology
- Chapter 9 Lands Soil and Geology
- Chapter 10 Hydrology and Hydrogeology
- Chapter 11 Air Quality
- Chapter 12 Noise and Vibration
- Chapter 13 LVIA
- Chapter 14 Archaeological, Architectural & Cultural Heritage
- Chapter 15 Traffic and Transport
- Chapter 16 Material Assets Aviation, Telecommunications and Other
- Chapter 17 Material Assets – Shadow Flicker
- Chapter 18 Climate
- Chapter 19 Major Accidents and Natural Disasters
- Chapter 20 Interaction of the Foregoing
- Chapter 21 Schedule of Mitigation Measures
- Appendix 1-1 ABP SID Application Determination
- Appendix 1-2 Planning Drawings
- Appendix 1-3 Strategic Framework for the Future Use of Peatlands
- Appendix 1-4 Derryadd WF EIA Revised Scoping Report
- Appendix 1-5 Consultee Responses
- Appendix 1-6 Derryadd Wind Farm Community Report
- Appendix 3-1 Amenity Plan
- Appendix 3-2 Construction Environmental Management Plan
- Appendix 3-3 TLI Outline Construction Methodology_110kV Substation and Connections
- Appendix 5-1 Planning Search 2015 to January 2025
- Appendix 7-1a P0504-01
- Appendix 7-1b P0504-01-A
- Appendix 7-2a BnaM Draft Rehabilitation Plans Derryaroge
- Appendix 7-2b BnaM Draft Rehabilitation Plans Derryadd
- Appendix 7-2c BnaM Draft Rehabilitation Plans Lough Bannow
- Appendix 7-3 Flood Risk Assessment
- Appendix 7.4 Habitat Survey (Alexis Fitzgerald, Fitzgerald Ecology)
- Appendix 7-5a River Habitat Survey Results (June 2022)
- Appendix 7-5b Sampling Site Photos (June 2022)
- Appendix 7-5c_Electrofishing and Macroinvertebrate Surveys
- Appendix 7-6 Bat Assessment Report
- Appendix 7.7 Whorl Snails Report (Adam Mantell, 2022)
- Appendix 7-8 Marsh Fritillary Survey Report
- Appendix 7-9 Habitat Survey – Plant Species List
- Appendix 8-1-Baseline Ornithological Surveys – Summer 2021
- Appendix 8-2 Baseline Ornithological Surveys – Migration and winter 2021-2022
- Appendix 8.3 Field Study Survey Effort All Seasons (8.3a – 8.3ddd)
- Appendix 8-4 Estimate of Disturbance Displacement Effect Extents
- Appendix 8-5 Derryadd Wind Farm – Collision Risk Modelling Report (Gittings, 2025)
- Appendix 8.6 Bird Monitoring Programme
- Appendix 9-1 Ground Investigation Reports
- Appendix 9-2 Peat & Spoil Management Plan
- Appendix 9-3 Peat stability Risk Assessment
- Appendix 10.1 WFD Assessment
- Appendix 10-2 Abstraction Point Data and ZOCs
- Appendix 10.3 Surface Water Management Plan
- Appendix 10-4 Hydraulic Permeability Data
- Appendix 12-1 Glossary of Acoustic Terms
- Appendix 12-2 Noise Meter Calibration Certs
- Appendix 12-3 Noise Modelling Assumptions and Inputs
- Appendix 12-4 Tabulated Omni-directional Turbine Noise Prediction Results
- Appendix 12-5 Turbine Noise Contours Map
- Appendix 13-1 Visual Effects
- Appendix 13-2 ZTV Map
- Appendix 13-3 Route Screen Analysis (RSA) Methodology
- Appendix 13-4 Route Screen Analysis (RSA) Map
- Appendix 13-5 Cumulative ZTV
- Appendix 14-1 List of all SMR’s and Brief Description
- Appendix 14-2 Description of Artefacts recorded in the Topographical Files of The National Museum of Ireland
- Appendix 14-3 Protected Structures and NIAH Structures within the Surrounding Area of the Proposed Windfarm Site
- Appendix 14-4 Summaries of previous Archaeological Surveys, Excavations, and Reassessment Surveys
- Appendix 14-5 Description of SMR’s and NIAH along the proposed Turbine Delivery Route
- Appendix 14-6 Longford Roscommon and Westmeath CDP
- Appendix 14-7 Plates from Field Walkover Survey, 2023
- Appendix 14-8 References
- Appendix 15-1 Traffic and Transportation Assessment TTA
- Appendix 15-2 Traffic Management Plan (TMP)
- Appendix 15-3 Abnormal Indivisible Load (AIL) Route Survey
- Appendix 15-4 Road Safety Audit
- Appendix 16-1 Derryadd Wind Farm Aviation Review Statement pdf
- Appendix 16-2 Derryadd Windfarm Telecoms Impact Assessment
- Appendix 17-1 Shadow Flicker Modelling Report